
Timeline
2013
2013

Sol Plaatje University (SPU) was established on 23 August 2013, as one of the two universities established post-apartheid in South Africa.
2014
First Cohort of Students
First Cohort of Students
2014

Sol Plaatje University (SPU) opened doors to its first cohort of students in 2014. Classes began on Monday 17 February 2014, with the first 141 students enrolled for academic programmes in Education, Retail Management and Information Technology.
2015

Generous sponsorship from Standard Bank (Northern Cape) allowed SPU to introduce the Bicycle Project in which staff and students are able to rent a SPUbranded bicycle at a nominal rental of R360 per year. Given the generally flat terrain of greater Kimberley, the project has proven to be popular and has reduced the cost of local travel for students.
2016
First Graduation.
The first Chancellor, Justice Steven Majiedt, and the first Vice_ Chancellor and Principal of the University, Prof Yunus Ballim, were installed..
2016

SPU Graduated its first cohort of students.
The first Chancellor, Justice Steven Majiedt, and the first Vice-Chancellor and Principal of the University, Prof Yunus Ballim, were installed.
2017
Expanded
2017

The SPU Library and Student Resources Building was one of the first two buildings, the construction of which was commenced under full SPU control. The building itself was designed as a landmark building, completing the south-end of the Central Campus Square, and has been designed flexibly to accommodate the changing nature of the concept of a library to accommodate both regular physical holdings of a library, as well as digital resources with both regular physical holdings of a library, as well as digital resources. In addition to its core library functions, this building will also provide student workspaces, classrooms on the second and third floors, seminar rooms, a multi-purpose auditorium (240-seater), a small conference centre with break-away rooms and space for archival and exhibition purposes. Work on this six-storeys building commenced in October 2015. Due to the complexity of the concrete exoskeleton and the core of the building, the project over-ran its time schedule. At the end of 2017, there were still small outstanding issues that required to be settled with the main contractor. Nevertheless, the Library won the prestigious national Fulton Award for 2017 in the category of building structures more than three storeys high. The Fulton Award was granted for the particularly innovative use of concrete in the building.
2018

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
2019
Expanded
2019

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
2020
Expanded
2020

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
2021
Expanded
2021

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
March 30
Sub Label
2022

Add Description Here
March 30
Sub Label
2023

Add Description Here
March 30
Sub Label
2019

Add Description Here